Electrical Load Demand
Connected load, demand factors, feeder sizing
Beta module: functional, with verification in progress.
Code references
Inputs
| Parameter | Unit |
|---|---|
| Lighting Load | W |
| Receptacle Load | W |
| Largest Motor | W |
| All Motor Loads | W (JSON) |
| System Voltage | V |
| Number of Phases | — |
| Cable Run Length | m |
| Cable Cross-Section | mm² |
| Ambient Temperature | °C |
Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.
Related calculators
Cable Sizing
VerifiedPower cable selection with derating and voltage drop
Solar PV
VerifiedSolar photovoltaic system sizing and energy yield
Transformer Sizing
BetaDistribution transformer capacity and impedance sizing
Generator Sizing
BetaStandby generator sizing with step loading analysis
UPS Sizing
BetaUninterruptible power supply capacity and battery sizing
Short Circuit
BetaShort circuit current calculation for protective device coordination
Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.
Frequently asked questions
- What does the Electrical Load Demand calculator do?
- Connected load, demand factors, feeder sizing. It references SBC 401 (Saudi Electrical Code).
- Which Saudi Building Code references does the Electrical Load Demand calculator use?
- The Electrical Load Demand calculator references SBC 401 (Saudi Electrical Code).
- What inputs does the Electrical Load Demand calculator need?
- The Electrical Load Demand calculator takes 9 inputs: Lighting Load (W), Receptacle Load (W), Largest Motor (W), All Motor Loads (W (JSON)), System Voltage (V), Number of Phases, Cable Run Length (m), Cable Cross-Section (mm²), Ambient Temperature (°C).
- Is the Electrical Load Demand calculator verified?
- Electrical Load Demand is a beta module. It works, but verification is still in progress. Its results carry documented limitations and require review by a licensed SCE-registered engineer before submission or site execution.