Earned Value
Earned value management metrics (CPI, SPI, EAC, ETC)
Verified module: SI units, SBC-referenced, deterministic, with documented verification metadata.
Code references
PMI PMBOK
Inputs
| Parameter | Unit |
|---|---|
| Budget at Completion | SAR |
| Planned Value to Date | SAR |
| % Physical Complete | % |
| Actual Cost to Date | SAR |
Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.
Related calculators
Schedule Risk
VerifiedAnalytical (CLT) schedule risk analysis per AACE RP 57R-09 (not a Monte Carlo simulation)
Resource Leveling
BetaResource histogram leveling and over-allocation resolution
Look-Ahead Schedule
BetaRolling look-ahead schedule with constraint analysis
Weather Impact
BetaWeather delay probability assessment for KSA regions
Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.
Frequently asked questions
- What does the Earned Value calculator do?
- Earned value management metrics (CPI, SPI, EAC, ETC). It references PMI PMBOK.
- Which Saudi Building Code references does the Earned Value calculator use?
- The Earned Value calculator references PMI PMBOK.
- What inputs does the Earned Value calculator need?
- The Earned Value calculator takes 4 inputs: Budget at Completion (SAR), Planned Value to Date (SAR), % Physical Complete (%), Actual Cost to Date (SAR).
- Is the Earned Value calculator verified?
- Earned Value is a verified module: SI units, SBC-referenced, deterministic, with documented verification metadata. Like all Insha by Schnell outputs, its results require review by a licensed SCE-registered engineer before submission or site execution.