Bill Preparation
Bill of quantities preparation per NRM2 work sections
Beta module: functional, with verification in progress.
Code references
NRM2
Inputs
| Parameter | Unit |
|---|---|
| Project Name | — |
| Preliminaries % | % |
| Contingency % | % |
| Measured BOQ Items (JSON array) | — |
Runs in the Insha by Schnell workspace. Verified calculators return explicit pass / fail / warning results with a clause trail.
Related calculators
Rate Analysis
VerifiedUnit rate build-up from labour, material, and plant costs
Value Engineering
VerifiedValue engineering opportunity analysis and cost-benefit
Lifecycle Cost
VerifiedWhole-life cost analysis per ISO 15686-5
Area Measurement
BetaGIA, NIA, and efficiency ratio calculation per RICS
Cost Benchmark
BetaConstruction cost benchmarking per NRM1 categories
Cashflow Projection
BetaS-curve cashflow projection for construction projects
Insha by Schnell is in beta. All calculator outputs require review by a licensed SCE-registered engineer before submission to MOMRA, Civil Defense, MODON, the Royal Commission, or site execution.
Frequently asked questions
- What does the Bill Preparation calculator do?
- Bill of quantities preparation per NRM2 work sections. It references NRM2.
- Which Saudi Building Code references does the Bill Preparation calculator use?
- The Bill Preparation calculator references NRM2.
- What inputs does the Bill Preparation calculator need?
- The Bill Preparation calculator takes 4 inputs: Project Name, Preliminaries % (%), Contingency % (%), Measured BOQ Items (JSON array).
- Is the Bill Preparation calculator verified?
- Bill Preparation is a beta module. It works, but verification is still in progress. Its results carry documented limitations and require review by a licensed SCE-registered engineer before submission or site execution.